skip to main
|
skip to sidebar
BIG RENOVATION AND MOVE
Thursday, September 24, 2009
Views of new bath..
Reconfigured stairway
The Kitchen...
Thursday, September 17, 2009
JACK IT UP BOYS
Friday, September 11, 2009
sanding...Sanding...SANDING
Previous gas stove out...now wired for new electric...
Labor Day Lunch at 249
Current powder room..soon to be closet space!
The new bathroom...
Tuesday, September 8, 2009
Construction Engineer Extrodinaire
Saturday, September 5, 2009
Really taking on a good look...all trees pruned and sunlight is now gleaming through the windows.
Finally some PICTURES!!! With the yard work now complete...we moved to inside work today!
Wednesday, September 2, 2009
The contractor is d/t begin demolition to the small room that will soon be a first floor bathroom on Friday 9.4.09...and improvement will follow as will pix! (with the help of Breezee)
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Followers
Blog Archive
▼
2009
(29)
►
November
(5)
►
October
(9)
▼
September
(13)
Views of new bath..
Reconfigured stairway
The Kitchen...
JACK IT UP BOYS
sanding...Sanding...SANDING
Previous gas stove out...now wired for new electri...
Labor Day Lunch at 249
Current powder room..soon to be closet space!
The new bathroom...
Construction Engineer Extrodinaire
Really taking on a good look...all trees pruned an...
Finally some PICTURES!!! With the yard work now c...
The contractor is d/t begin demolition to the smal...
►
August
(2)
About Me
dwp
View my complete profile